Port Sudan, April 12 (SUNA) - Al-Khair Port, which is specialized in handling petroleum products at Port Sudan Harbor has been witnessing regular arrival and unloading of petroleum products tankers.

A tanker carrying 5046 tons cooking gas and another one loaded with 48598 tons of furnace were unloaded.

 Meanwhile, the waiting area outside the port received three gasoline tankers with a total load of (71,444) tons, and a cooking gas tanker with a load of 5504 tons.

The two tankers are waiting for completion of the procedures required before entering to unloading docks inside the port.

The Director of Al-Khair Port, Captain Rami Omer Seyam, affirmed in statement to SUNA that the port is ready to receive and unloading all petroleum products tankers that would arrive to the port.

AA/BT

أخبار ذات صلة